St Columbas Catholic College

St Columbas Catholic College

Architect
Alleanza Architecture
Builder
FAL Construction Group
Contractor
Laser Electrical and Communications Penrith
Consultant
HJR Lighting and Ayua Studio / CoLab
Photographer
Frame&Focus
1648X824 Full 6
Engineering Precision for Modern Pedagogy

This project delivered a sophisticated lighting solution for a new two-storey Technological and Applied Studies (TAS) and General Learning Area (GLA) block.

495X343 Hero2

Overview

The facility supports high-impact educational environments, including dedicated woodwork, metalwork, textiles, and Visual Art spaces on the ground floor, with nine General Learning spaces situated upstairs.

At CoLab, we understand that educational lighting must enhance focus in theoretical spaces while ensuring safety and precision in practical workshops.

855X855 Bench
Navigating Specification Restrictions

The primary challenge during the pre-commencement phase involved securing approval from electrical consultants for an alternate lighting package. Stringent lux level requirements and technical benchmarks required a partner capable of providing robust data and transparent engineering.

We win specifications by proving our products are code-compliant and "control-ready," backed by the photometric documentation needed to de-risk complex projects.

495X343 Centre

HJR & CoLab Lighting Partnership

Tasked by Laser Electical to provide an alternative to their original tender, HJR utilised its extensive commercial lighting knowledge to source a superior package through CoLab Lighting.

This long-standing partnership allows HJR to act as a seamless intermediary between Laser’s project needs and CoLab’s manufacturing capabilities. By balancing price and quality, HJR effectively bridges the gap between client expectations and technical execution.

855X855 Centre
The CoLab & Laser Partnership

To overcome initial hurdles, CoLab served as a technical partner, providing intensive support to ensure the design met every performance metric. Laser Electrical and Communications Penrith was awarded the project through a standard construction tendering process, bringing over 30 years of experience in school environments to the table.

495X343 Off Centre

Collaborative Engineering

Laser prides itself on school projects and maintenance, focusing not only on the immediate installation but also on how the school will maintain the system long-term.

Their Project Managers worked closely with experienced Site Leading hands to coordinate with Principal Contractors daily, ensuring project timelines were met through rigorous weekly scheduling and a deep knowledge of site requirements.

855X855 Bench 2
Testing, Commissioning, and Control

Testing and Commissioning represent the most critical phase of any project to ensure end-user safety and operational integrity. Laser’s site staff possess a foundational understanding of DALI protocols, supported by dedicated in-house technicians for specialty programming of DALI and CBus systems.

This expertise ensured that the "control-ready" CoLab fixtures were seamlessly integrated into the building’s ecosystem.

495X343 Centre 2

A Future-Proof Educational Environment

The chosen luminaires were selected for their exceptional build quality and ease of maintenance.

By adhering strictly to AS/NZS 3000 wiring standards and providing locally supported technical expertise, the collaboration between CoLab, HJR Lighting and Laser Electrical delivered a seamless installation that met the client's goals on time and to the highest professional specification.

855X855 Bench 3